Section 7 of AS/NZS 3000:2018, special installations: eCertify lists 47 of 65 marked changes since 2007 and explains each one in a single plain sentence.

This page is part of eCertify's guide to what changed from AS/NZS 3000:2007 to 2018. It covers Section 7, which the standard calls Special electrical installations: safety services such as fire pumps and emergency lifts, generators, solar and batteries, separated supplies, high voltage, the list of installation-specific standards, and the New Zealand rules for electric vehicle charging.
AS/NZS 3000:2018 and its amendments mark 65 items in Section 7 as changed. This page lists 47 of 65 marked changes; the other 18 only fix a cross-reference, renumber a rule, head a list, repeat a guidance pointer the 2007 edition already gave, or delete text that can no longer be read. eCertify read every one against the 2007 edition or the amendment itself. The real substance is in the rebuilt safety services clause, generator connections and the new electric vehicle clause, and Schedule 2 modifies none of them for New Zealand.
eCertify's short version of what Section 7 now asks of you on the job:
Wherever the 2018 edition changed a clause, table or figure significantly from 2007, it prints an asterisk beside it in the margin. Amendments 1 to 3 flag their own edits with a bar and a tag. Either mark tells you that something changed, never what. So eCertify read each marked Section 7 item side by side with the 2007 edition, checked each amendment-only item against the amendment's own instructions, and summed up the difference in a single plain sentence. Marked edits that only fix a cross-reference, renumber a rule or repeat a guidance pointer the 2007 edition already gave are not listed, and nor are smaller edits the standard left unmarked.
The clause numbers and headings are the standard's. The sentences are eCertify's, so go to the standard itself before you rely on a detail on the job.
New Zealand check: the Electricity (Safety) Regulations 2010 modify the Wiring Rules for New Zealand in their Schedule 2, and none of those modifications touches Section 7. Clause 7.9 on electric vehicles applies in New Zealand only, and where an item below carries an Australia-only or New Zealand-only label, its sentence says so. The October 2026 amendment to that schedule reinstated the ban on switching a PEN conductor, which matters when you wire a generator changeover. Under Schedule 1AA of the same regulations, complying with the 2007 edition stopped counting as compliance at the close of 12 November 2026.
Jordan Statham, eCertify's director, is an EWRB-registered electrical inspector.
eCertify's side-by-side read found that clause 7.2 was rebuilt from the ground up, and five of its marked items change what you do with safety-service supplies.
Clause 7.2.1, Scope and general. The safety services covered are the same as in 2007, but a new note now explains the three parts of a fire-resistance level: structural adequacy, integrity and insulation, in that order.
Clause 7.2.1.2, General. The exclusions now sit in one list, and the lift test changes: 2007 let off a lift that passengers can safely leave when the power fails, while 2018 lets off any lift the NCC or NZBC does not define as an emergency lift (Amendment 1 also deleted one exception).
Clause 7.2.2, Supply systems. The fire-survival rule now names generator, normal, alternate and outbuilding supplies alongside consumer mains, and where no WS classification is set, safety-service conductors keep 50 mm or a barrier from other wiring and other safety services, with cabling that crosses zones built to the strictest protection.
Clause 7.2.2.1, General. Amendment 1 adds an exception that takes fire detection, alarm and intercom systems with battery backup to AS 1670 or NZS 4512 out of this general supply clause.
Figure 7.1, WS wiring for lift circuits. A new drawing showing which part of a lift circuit needs a WS-classified wiring system and where the fire rating must be kept at the shaft; the 2007 switch-layout drawing that carried this number gives way to two main switchboard layouts, Figures 7.2(A) and 7.2(B).
By eCertify's count, three marked items reshape how a safety-services main switchboard is built and switched.
Clause 7.2.3, Main switchboard and switchgear. A new clause gathers the board rules: it follows clause 2.10 and the building code, metal partitions between safety and general switchgear now apply on every board that keeps safety services supplied (a plastic-cased board does not comply), a supply isolating device must be a load-break switch or circuit-breaker, and discrimination reaches back to the upstream device.
Clause 7.2.4, Main switches. An auto transfer switch may now serve as a safety-service main switch if it meets clause 2.3.3, the main switch markings must be in capitals, and a fire-separated part of a building now needs an FRL of 120/120/120 to count as a separate building, against 2007's 120 minutes.
Clause 7.2.4.2, Arrangement of main switches. Amendment 1 renamed the clause and widened its outbuilding exception to individual outbuildings, combined outbuildings and fire-separated parts of a building, while 2007's exceptions for a secure switching arrangement and for an alternative supply are no longer in the list.
eCertify found that fire pumps now have a clause of their own, with three marked items that change how they are supplied and isolated.
Clause 7.2.5, Fire pumps and fire pump control equipment. Fire pumps get a dedicated clause, which adds pump control equipment, its wiring and pump rooms to the list and sets their own wiring, segregation, switchgear and interposing-switch rules.
Clause 7.2.5.1, General. Amendment 1 rewrote the exception for equipment whose failure leaves the safety services working, with an open list of examples that now names jockey pumps and diesel fire pump controller circuits built to AS 2941.
Clause 7.2.5.6.1, Isolating switches for fire-pump motors. The manual isolator for an automatically controlled fire-pump motor now goes on the supply side of, and beside, the motor itself rather than its controller, and Amendment 1 adds clause 2.3.6 to the rules it must meet.
eCertify's read found that fire detection, air handling and evacuation equipment each get their own clause, where 2007 handled them together in one list.
Clause 7.2.6, Fire and smoke detection equipment and fire alarm systems. Detection equipment, fire indicator panels, alarm systems and warning and intercom systems get their own clause, with WS-classified wiring kept 50 mm or a barrier from all other wiring, and no switch between the main switch and the boards feeding them.
Clause 7.2.7, Air-handling systems. Smoke-control air handling, one line in the 2007 equipment list, now has its own clause on the same pattern: WS-classified wiring, 50 mm or a barrier from other wiring, and no interposed switches.
Clause 7.2.8, Evacuation equipment. Evacuation equipment now means emergency sound and intercom systems to AS 1670.4, and central emergency evacuation lighting, which 2007 included, is left to the building code.
eCertify's read found two marked lift clauses, one narrowing which lifts count in New Zealand and one entirely new.
Clause 7.2.9, Emergency lifts. In New Zealand a lift is a safety service only where it must run for firefighting or other emergencies (the Australian test follows the NCC), where 2007 caught electric passenger lifts unless people could safely get out, and these lifts get their own wiring, segregation, switchgear and interposing-switch rules.
Clause 7.2.10, Emergency motor-room-less lifts. New for lifts with no machine room that serve evacuation or firefighting: the lift switchboard may not sit in the shaft, a remote board feeding them must be readily accessible inside a fire-rated room or enclosure, and their wiring is WS-classified.
eCertify found four marked changes in the general rules for generators, solar, wind and battery systems. For the inspection paperwork on mains and generation work, see eCertify's guide to high-risk electrical work and mains inspections.
Clause 7.3.1, General. A stand-alone power system is now defined as one with no connection to the network, fed by solar, wind, hydro or an engine-driven set, where 2007 described it as a renewable source feeding the installation through an inverter or as d.c.
Clause 7.3.2, Selection and installation of system. Amendment 1 adds AS/NZS 5139 to the AS 3011 series as the standards battery systems must meet.
Clause 7.3.4.1, General. An inverter or other regenerative source may no longer be connected downstream of a generator's changeover device unless controls stop it backfeeding the generator, and the exception, rewritten by Amendment 2, now lets other related standards vary where the isolator goes, where 2007 deemed AS/NZS 4509.1 and AS 4777 arrangements to comply.
Clause 7.3.5.1, Electricity generation system protection. Overcurrent protection now follows the generating system's own standard first, with this clause as the fallback, and unprotected conductors from a generating set to its switchboard may run underground as well as in metal or non-combustible enclosure, where 2007 allowed only a non-flammable enclosure.
eCertify's comparison found the biggest generator change of the section here, in where the neutral-earth link sits when a generator takes over. Changeover switching and the PEN conductor are covered in eCertify's guide to AFDDs and PEN switching.
Clause 7.3.8.1.1, General (alternative supplies). The MEN connection for a stand-by supply is now made at the main switchboard, the remote-MEN exception letting neutral and earth share current at a distribution board applies in Australia only, and a new New Zealand-only rule needs a neutral-earth connection and an earth connection in a distribution board without an N-E link while it runs on the generator, per AS/NZS 3010, but not on normal supply.
eCertify found four generator connection drawings that Amendment 2 deleted and redrew, each now noting no neutral-earth connection at the generating set.
Figure 7.3, Three-phase changeover, local MEN. Replaced by Amendment 2: a three-phase generator supply through a three-pole changeover to a board with its own MEN link, the case 2007 also drew as Figure 7.3, while 2007's three-pole to four-pole changeover drawing (its Figure 7.2) has no 2018 counterpart.
Figure 7.4, Stand-alone set to local-MEN board. Amendment 2 replaced this drawing of a stand-alone system feeding a switchboard with its own MEN link (Figure 7.6 in 2007); the current version shows a generator short-circuit protection device and no neutral-earth connection at the generating set.
Figure 7.5, Single-phase plug-in generator. Replaced by Amendment 2: a single-phase alternative supply connected by plug and appliance inlet to a board with its own MEN link, the case 2007 covered in a single plug-and-socket drawing, its Figure 7.4.
Figure 7.6, Three-phase plug-in generator. Replaced by Amendment 2: the three-phase version of the plug-and-socket connection, so 2018 draws single-phase and three-phase separately where 2007 had one drawing.
eCertify's side-by-side read of the separated supply and high voltage clauses found three marked changes of substance.
Clause 7.4.7, Variable speed drive (VSD) EMI filters. New: on an electrically separated supply, a drive's EMI filter must not be referenced to the system frame, and one filter is recommended where several drives share the supply (the 2007 clause 7.4.7 was the testing clause, now 7.4.8).
Figure 7.8, Separated supply examples. Renumbered from 2007's Figure 7.7, and its note on output protection now names a circuit-breaker opening every live conductor, neutral included, or HRC fuses in every active, where 2007 said a double-pole breaker or an HRC fuse.
Clause 7.6.3, Issues relevant to high voltage installations. Amendment 1 rewrote the opening so the eleven design issues, insulation levels through to testing, are ones that shall be taken into account at 1 kV or more, where 2007 framed them as issues to consider; the list itself is unchanged.
eCertify found clause 7.8 now splits its standards into rules and guidance, and the generation and battery standards move into the rules.
Clause 7.8.1, Scope. Amendment 1 rewrote the scope: each listed standard governs its own installation type, AS/NZS 3000 covers anything it leaves out, and 7.8.2 holds standards that add to, replace or modify the general rules, while 2007's deemed-to-comply group (AS/NZS 3018 for single domestic installations) is gone.
Clause 7.8.2.10, Generating sets. Moved up from 2007's guidance list: an installation using a generating set to supply above 50 V a.c. or 120 V d.c. must comply with AS/NZS 3010, which 2007 required only for generation systems under clause 7.3.2.
Clause 7.8.2.11, Inverters. New to the rules list: grid connections of energy systems through inverters must comply with the AS/NZS 4777 series, which 2007 called up only inside clause 7.3.2.
Clause 7.8.2.13, Stand-alone power systems. New to the rules list: stand-alone power systems must comply with the AS/NZS 4509 series, named in 2007 only inside clause 7.3.2.
Clause 7.8.2.14, Photovoltaic (PV) arrays. New to the rules list: an installation that includes a PV array must comply with AS/NZS 5033, again named in 2007 only inside clause 7.3.2.
Clause 7.8.2.15, Secondary battery systems. Rewritten by Amendment 1: battery energy storage systems and their batteries must comply with AS/NZS 5139, and other secondary batteries outside its scope, such as telecommunications, UPS or hospital systems, follow the AS 3011 series, where 2007 named AS 3011 alone.
eCertify's read found four more entries new to the 7.8.2 rules list, two of them applying in New Zealand only.
Clause 7.8.2.9, High voltage installations. New to the list: Australia's high voltage work follows AS 2067 and New Zealand's follows the Electricity (Safety) Regulations, the same split 2007 already made in clause 7.6.2.
Clause 7.8.2.16, Mobile medical facilities. New, New Zealand only: electrical installations for mobile medical facilities must comply with NZS 6115, which the 2007 edition did not mention.
Clause 7.8.2.17, Floor and ceiling heating systems. New, New Zealand only: floor and ceiling heating installations must comply with NZS 6110, where 2007 only pointed to that standard in a note under clause 4.10.1.
Clause 7.8.2.18, Explosive atmospheres and hazardous areas. New: an installation in a hazardous area that complies with AS/NZS 60079.14 is deemed to comply with AS/NZS 3000, where 2007 only required equipment to be selected and installed to that standard (clause 7.7.2.4).
eCertify lists one of the seven standards new to the 7.8.3 guidance list. Guidance standards add no duty, and the other six are left off because they only repeat a pointer the 2007 edition already gave elsewhere.
Clause 7.8.3.7, Rotating electrical machines. The AS 60034 series joins the list for rotating machines, a standard the 2007 edition did not cite at all.
eCertify found no electric vehicle rules anywhere in the 2007 edition; clause 7.9 arrived with Amendment 1 and applies in New Zealand only. The circuit-level EV rules are on Section 2, protection and switchboards, and the charging-mode guidance in Appendix P is on the appendix changes page.
Clause 7.9, Supplies for electric vehicles (NZ only). Amendment 1 deleted the clause 7.9 printed in 2018 and replaced it with this New Zealand-only clause on supplies for EV charging.
Clause 7.9.1, Scope. The EV rules add to or change Sections 2 to 7 for the parts of an installation meant for charging, with notes pointing to Appendix P on charging modes, EV load in maximum demand, and distributor notification.
Clause 7.9.2.1, Source of supply. An EV charging supply must not come from an outbuilding switchboard that runs as a separate MEN installation under clause 5.5.3.1.
Clause 7.9.2.2, Socket-outlets for Mode 1 charging. No socket-outlet may be installed for Mode 1 charging (Appendix P explains the modes).
eCertify's read of the charging facility rules: new homes with a built-in garage must be ready for charging, and charger circuits get their own RCD. Socket-outlet installation for EVs is on Section 4, electrical equipment.
Clause 7.9.3.1, Facilities for other than Mode 1 charging. Every new domestic installation whose garage is fully enclosed, has a door and is part of the main dwelling must include an EV charging facility, built to the Mode 2 rule or the Mode 3 and 4 rule.
Clause 7.9.3.2, Facilities for Mode 2 charging. A Mode 2 facility needs its own final subcircuit of at least 20 A serving nothing else, a socket to one of four listed standards that the plug does not switch, mounted 800 mm or more above floor or ground.
Clause 7.9.3.3, Facilities for Mode 3 and 4 charging. A Mode 3 or 4 supply needs a dedicated circuit (at least 32 A single-phase), its own 30 mA Type B RCD on active and neutral (Type A plus an RDC-DD allowed for Mode 3), direct connection, a 32 A isolator beside the charger, and the outlet or cable 800 mm up.
Clause 7.9.4, Other electrical installations (NZ only). Outside domestic installations, the EV final subcircuit gets the same protection: its own 30 mA Type B RCD on all live conductors, RCBOs allowed, or for Mode 3 a Type A RCD with an RDC-DD.
In Section 7 of AS/NZS 3000:2018, 47 of 65 marked changes are changes of substance. Comparing them with 2007, eCertify finds the weight in four areas: safety services rebuilt clause by clause with their own separation and switching rules; generator connections, with the stand-by MEN connection at the main switchboard and a New Zealand-only rule for distribution boards; clause 7.8 turning the generation, inverter, PV and battery standards into rules; and a New Zealand-only electric vehicle clause, new in Amendment 1, that makes new homes with an internal garage ready for charging. Schedule 2 modifies none of them for New Zealand.