Sparkies! Carried out mains work? Upgrading a switchboard, upgrading mains cable, or hammering in a new electrode? Let's get you sorted with an ROI today, anywhere in Auckland.
eCertify's high-risk mains work electrical inspection for Auckland electricians, including ROI certification compiling and High Risk Database (Energy Safety) submission. Applies to mains work only.
Before we arrive, make sure your testing and documentation are ready: main earth identified and tagged, electrode location listed on the switchboard and accessible, earth continuity under 0.5 ohm, mains polarity and earth fault loop impedance tested, and your ESC/COC on site. Ask us for the full pre-inspection checklist when you book. Re-inspection charges apply if items are missed and we need to return.
Note: we are not MEPs. Metering work must be carried out by a network approved inspector, and we can recommend one in your area.
It is not a judgement call and it is not your client's preference. The Electricity (Safety) Regulations 2010 classify mains work on an installation as high risk prescribed electrical work, and all high risk prescribed electrical work on a low or extra low voltage installation must be inspected. Switchboard upgrades, mains cable upgrades and new electrodes all land in that bracket.
Photovoltaic systems and mains parallel generation are in the same category, so if you are doing solar the same requirement applies.
Worth saying plainly, because it changes when you can invoice. Under the regulations, high risk prescribed electrical work may not be treated as complete until a certificate of compliance, together with any record of inspection required for the work, has been issued for it. The ROI is not an administrative afterthought. It is part of what makes the job finished.
Re-inspection charges apply if we have to come back for something that should have been ready, so this list is worth two minutes.
Ask us for the full pre-inspection checklist when you book and we will send it through.
You get the record of inspection, with the certificate of compliance attached to it, and we handle the High Risk Database submission to Energy Safety. The regulations set the timeframes here too: a copy of the record of inspection goes to the person who contracted for the work within 20 working days, a copy goes to anyone entitled to request one within 10 working days of the request, and a copy has to be retained for at least seven years. We keep ours, so if a client comes back to you in year five asking for it, we can produce it.
We are not MEPs. Metering work has to be done by a network approved inspector. Tell us if there is metering in scope and we will point you at someone in your area rather than turning up and telling you on the day. This product also covers mains work only, so if you have general prescribed electrical work needing inspection, talk to us first about what is in scope. Our electrical inspections page covers the wider range.
The price is fixed and includes GST. It covers the inspection, the ROI compilation and the High Risk Database submission. Re-inspection is charged separately, which is the whole reason for the checklist above.
Background reading: our article on high risk electrical work and mains inspections goes through the categories in more detail.
All-inclusive fixed price. Any remedial work is quoted and confirmed before we proceed.